ISTQB Sample Question Paper Dump #9 with answer
1. The process starting with the terminal modules is called -
a. Top-down integration
b. Bottom-up integration
c. None of the above
d. Module integration
2. The inputs for developing a test plan are taken from
a. Project plan
b. Business plan
c. Support plan
d. None of the above
3. If an expected result is not specified then:
a. We cannot run the test
b. It may be difficult to repeat the test
c. It may be difficult to determine if the test has passed or failed
d. We cannot automate the user inputs
4. Which of the following could be a reason for a failure
1) Testing fault
2) Software fault
3) Design fault
4) Environment Fault
5) Documentation Fault
a. 2 is a valid reason; 1,3,4 & 5 are not
b. 1,2,3,4 are valid reasons; 5 is not
c. 1,2,3 are valid reasons; 4 & 5 are not
d. All of them are valid reasons for failure
5. Test are prioritized so that:
a. You shorten the time required for testing
b. You do the best testing in the time available
c. You do more effective testing
d. You find more faults
6. Which of the following is not a static testing technique
a. Error guessing
b. Walkthrough
c. Data flow analysis
d. Inspections
7. Which of the following statements about component testing is not true?
a. Component testing should be performed by development
b. Component testing is also know as isolation or module testing
c. Component testing should have completion criteria planned
d. Component testing does not involve regression testing
8. During which test activity could faults be found most cost effectively?
a. Execution
b. Design
c. Planning
d. Check Exit criteria completion
9. Which, in general, is the least required skill of a good tester?
a. Being diplomatic
b. Able to write software
c. Having good attention to detail
d. Able to be relied on
10. The purpose of requirement phase is
a. To freeze requirements
b. To understand user needs
c. To define the scope of testing
d. All of the above
11. Verification is:
a. Checking that we are building the right system
b. Checking that we are building the system right
c. Performed by an independent test team
d. Making sure that it is what the user really wants
12. A regression test:
a. Will always be automated
b. Will help ensure unchanged areas of the software have not been affected
c. Will help ensure changed areas of the software have not been affected
d. Can only be run during user acceptance testing
13. Function/Test matrix is a type of
a. Interim Test report
b. Final test report
c. Project status report
d. Management report
14. Defect Management process does not include
a. Defect prevention
b. Deliverable base-lining
c. Management reporting
d. None of the above
15. What is the difference between testing software developed by contractor outside your country, versus
testing software developed by a contractor within your country?
a. Does not meet people needs
b. Cultural difference
c. Loss of control over reallocation of resources
d. Relinquishments of control
16. Software testing accounts to what percent of software development costs?
a. 10-20
b. 40-50
c. 70-80
d. 5-10
17. A reliable system will be one that:
a. Is unlikely to be completed on schedule
b. Is unlikely to cause a failure
c. Is likely to be fault-free
d. Is likely to be liked by the users
18. How much testing is enough
a. This question is impossible to answer
b. The answer depends on the risks for your industry, contract and special requirements
c. The answer depends on the maturity of your developers
d. The answer should be standardized for the software development industry
19. Which of the following is not a characteristic for Testability?
a. Operability
b. Observability
c. Simplicity
d. Robustness
20. Cyclomatic Complexity method comes under which testing method.
a. White box
b. Black box
c. Green box
d. Yellow box
21. Which of these can be successfully tested using Loop Testing methodology?
a. Simple Loops
b. Nested Loops
c. Concatenated Loops
d. All of the above
22. To test a function, the programmer has to write a ______, which calls the function and passes it test
data.
a. Stub
b. Driver
c. Proxy
d. None of the above
23. Equivalence partitioning is:
a. A black box testing technique used only by developers
b. A black box testing technique than can only be used during system testing
c. A black box testing technique appropriate to all levels of testing
d. A white box testing technique appropriate for component testing
24. When a new testing tool is purchased, it should be used first by:
a. A small team to establish the best way to use the tool
b. Everyone who may eventually have some use for the tool
c. The independent testing team
d. The vendor contractor to write the initial scripts
25. Inspections can find all the following except
a. Variables not defined in the code
b. Spelling and grammar faults in the documents
c. Requirements that have been omitted from the design documents
d. How much of the code has been covered
Answers
1 » B
2 » A
3 » C
4 » D
5 » B
6 » A
7 » D
8 » C
9 » B
10 » D
11 » B
12 » B
13 » C
14 » B
15 » B
16 » B
17 » B
18 » B
19 » D
20 » A
21 » D
22 » B
23 » C
24 » A
25 » D
Note:-If you required anything regarding ISTQB just comment here.
Based on that I will write my blog or if possible I will forward in your email id.
Hi I plan to write ISTQB exam by july pls send the question paper which is effective from april 1st
ReplyDeletehi,
ReplyDeletecan you plz send me the question paper dumps for foundation level to satya_jataprole@yahoo.com
thank u
hi, I am writing the istqb this aug 6th. if u have more questions please forward it to simianis@gmail.com.
ReplyDeletethanks simi
m not sure ...ki all the answers are correct here.,...can u confirm ??
ReplyDeleteCan you please send me some sample papers for ISTQB?
ReplyDeleteMy mail address is- karnika.baweja@gmail.com.
Thanks in advance.
Thanks,
Karnika
Hi
ReplyDeleteI am planning to write ISTQB foundation and advanced as well. appreciate if you can forward me material & dumps related to exam.
please forward to " mail2sesh@gmail.com "
Hi Iam planning to write ISTQB foundation level exam and can you please send the latest question paper dump for 2011 format which is effective from april 1st to rajpinn@gmail.com
ReplyDeleteThanks,
Rajesh
Hi, i am planning to write ISTQB foundation exams in march. Could u pls send the latest question paper dumps to vidya.ettanps@gmail.com
ReplyDeleteThanks,
Vidya
hi i m planing to attend the ISTQB foundation level exam in next 10 days.Could you please send me latest dumps to shiny_rao2006@yahoo.com.
ReplyDeletethanks n regards
shiny
Hi,
ReplyDeletePlease send me Question papers with Answers dumps for ISTQB CTFL to akyanu4@gmail.com
Thanks,
Anu
Hi,
ReplyDeleteCan you please send me the question paper dumps for foundation level (ctfl_001) to chessen14@gmail.com
I´m planning to do the test on Dec 2015
Thank you
Roberto
Hi,
ReplyDeleteI am planning to write Adv level of ISTQB, Please mail me the latest Dumps with the Answers: calapu@affluentgs.com , i am planning for the next month.
hi i m planing to attend the ISTQB foundation level exam in next 20 days. plese me question papers dumps
ReplyDeletevenugopals2014@gmail.com
hi i m planing to attend the ISTQB foundation level exam on 16-apr-2016 days. plese me question papers dumps
ReplyDeletemy email id is gaju689@gmail.com
Hi i am planning to take the ISTQB foundation level exam next month, please send me the question paper dumps to my emaiId Tejasvininis@gmail.com.
ReplyDeleteHi i m planing to attend the ISTQB foundation level exam, Can you please send me the dumps for foundation level to nnhirani@gmail.com? Thanks in Advance.
ReplyDeleteCan you share the istqb dump question papers on pkiran808@gmail.com
ReplyDeletePlease check your mail :)
DeleteCan you share the istqb latest dumps question papers on vdatta.datta@gmail.com
ReplyDelete